|
Module HLS
Shop Floor Planning (Graphical
Capacity Planning / Sequence Planning): HYDRA-HLS
... to detect bottlenecks
and avoid capacity- & time conflicts at all times !
With HYDRA-HLS you plan production orders and their operations,
respectively, under consideration of all required resources
(machines, workstations, staff, material and tools) and
their availability as a result of earlier planning cycles.
Basic Performance Measures:
- Gantt Chart with display levels for operations, production
orders, project orders, tools & resources, staff requirements
- Alternative table-based planning facilities (drag&drop
and/ automatic), as well as combined grid-table &
Gantt Chart based planning environments
- Full integration with the online actual data feedback
from the shop floor at all times (Seamless integration
with the module HYDRA-ADE). Your planning situation is
always up to date.
- Display of capacity utilization in various display modes
- Consideration of resources availability
- Optimization of machine occupation
- Automatic machine- and/or workplace assignment
- Various planning strategies (i.e. setup optimization,
lowest WIP levels, least delivery delays, etc)
- Strategy definitions for reduction of throughput time
- Offline simulation of work shift and utilization modifications
- Optimization of individual capacities
- Monitoring of material and stock levels
- Numerous tables and evaluations
- Interfaces to ERP- and other planning systems
 |